Our media centre with all downloads and videos
This section contains the most important documents relating to the planning process and construction work for the new S4 line linking Hamburg and Bad Oldesloe. It's a wealth of information for you to enjoy.
Information brochures
- Brochure: S4 images (German)PDF4 MB13.09.2022
- Brochure: S4 images (English)PDF4 MB13.09.2022
- Brochure: construction section 1PDF2 MB13.09.2022
- Brochure: construction section 2PDF4 MB13.09.2022
- Brochure: construction section 3PDF4 MB23.11.2022
- Brochure: planning approval procedure for the S4PDF4 MB13.09.2022
- Brochure: land managementPDF4 MB13.09.2022
- S4 fact sheetPDF3 MB13.09.2022
Visualisations and charts
- Visualisation: Bovestrasse station (AnyMotion GmbH)JPG683 KB30.04.2021
- Visualisation: Wandsbek Rathaus station (VECTORVISION GbR)JPG4 MB14.05.2021
- Visualisation: Holstenhofweg station (VECTORVISION GbR)JPG406 KB29.04.2021
- Visualisation: Holstenhofweg station (VECTORVISION GbR)JPG408 KB29.04.2021
- Visualisation: Pulverhof station (VECTORVISION GbR)JPG380 KB29.04.2021
- Visualisation: Pulverhof station (VECTORVISION GbR)JPG382 KB29.04.2021
- Visualisation: Rahlstedt station (VECTORVISION GbR)JPG420 KB29.04.2021
- Visualisation: Rahlstedt station (VECTORVISION GbR)JPG431 KB29.04.2021
- Chart: emission limitsJPG113 KB30.04.2021
Panel discussion on 23 October 2017
Documents for planning approval section 1 (between Hasselbrook and Luetkensallee)
- Table of contentsPDF530 KB30.04.2021
- Document 1 – Explanatory reportPDF121 MB30.04.2021
- Document 2 – Overview maps and plansPDF36 MB30.04.2021
- Document 3 – Site plansPDF98 MB30.04.2021
- Document 4 – List of structuresPDF64 MB30.04.2021
- Document 5 – Land acquisition plansPDF70 MB30.04.2021
- Document 6 – Land acquisition directoryPDF7 MB30.04.2021
- Document 7 – Construction plans – Rail crossingPDF89 MB30.04.2021
- Document 7 – Construction plans – Wandsbek converter stationPDF25 MB30.04.2021
- Document 7 – Construction plans – FlyoversPDF30 MB30.04.2021
- Document 7 – Construction plans – Modular building for electronic interlocking, HasselbrookPDF4 MB30.04.2021
- Document 7 – Construction plans – Standard noise barriersPDF7 MB30.04.2021
- Document 7 – Construction plans – Standard retaining wallsPDF9 MB30.04.2021
- Document 8 – Cross-sections – Table of contentsPDF691 KB30.04.2021
- Document 8 – Cross-sections – Longitudinal sections of platformsPDF4 MB30.04.2021
- Document 8 – Cross-sections – Cross-sections of rail linePDF27 MB30.04.2021
- Document 9 – Elevation diagramsPDF1 MB30.04.2021
- Document 10 – Site facilities and usage plansPDF59 MB30.04.2021
- Document 11 – Plans of cable and pipe locationsPDF67 MB30.04.2021
- Document 12 – Regulation of water management issues – 00 Table of contentsPDF884 KB30.04.2021
- Document 12 – Regulation of water management issues – Drainage system plansPDF67 MB30.04.2021
- Document 12 – Regulation of water management issues – Explanatory reportPDF251 KB30.04.2021
- Document 12 – Regulation of water management issues – Hydraulic calculationsPDF21 MB30.04.2021
- Document 12 – Regulation of water management issues – Kostra grid data sheetPDF1 MB30.04.2021
- Document 12 – Regulation of water management issues – Overview plan of drainage conceptPDF4 MB30.04.2021
- Document 13 – Environmental impact study – 00 Table of contentsPDF763 KB30.04.2021
- Document 13 – Environmental impact study – Explanatory reportPDF44 MB30.04.2021
- Document 13 – Environmental impact study – PlansPDF424 MB30.04.2021
- Document 14 – Environmental impact mitigation plan – 00 Table of contentsPDF1 MB30.04.2021
- Document 14 – Environmental impact mitigation plan – Infrastructure and conflict plansPDF166 MB30.04.2021
- Document 14 – Environmental impact mitigation plan – Explanatory reportPDF109 MB30.04.2021
- Document 14 – Environmental impact mitigation plan – Forms for measuresPDF37 MB30.04.2021
- Document 14 – Environmental impact mitigation plan – Plans of intended measuresPDF80 MB30.04.2021
- Document 14 – Environmental impact mitigation plan – Overview plans of measuresPDF15 MB30.04.2021
- Document 15 – Operational noise impact study – 15.01 DocumentPDF81 MB30.04.2021
- Document 15 – Operational noise impact study – 15.01 Document 1PDF927 KB30.04.2021
- Document 15 – Operational noise impact study – 15.02 Noise maps – railPDF143 MB30.04.2021
- Document 15 – Operational noise impact study – 15.03 Noise maps – roadPDF31 MB30.04.2021
- Document 16 – Operational vibrations impact study – 16.01 Explanatory reportPDF22 MB30.04.2021
- Document 16 – Operational vibrations impact study – 16.02 Taking of vibration measurementsPDF259 MB30.04.2021
- Document 16 – Operational vibrations impact study – 16.03 Forecast for vibrations and secondary airborne noisePDF64 MB30.04.2021
- Document 16 – Operational vibrations impact study – 16.04 Plans of the required protective measuresPDF13 MB30.04.2021
- Document 16 – Operational vibrations impact study – 16.05 Forecast for individual measurement objectsPDF180 MB30.04.2021
- Document 17 – Construction-related noise and vibrations impact study – 17.00 DocumentPDF873 KB30.04.2021
- Document 17 – Construction-related noise and vibrations impact study – 17.01 Explanatory reportPDF9 MB30.04.2021
- Document 17 – Construction-related noise and vibrations impact study – 17.03 Grid noise mapsPDF218 MB30.04.2021
- Document 18 – Geotechnical investigation – 18.00 Geotechnical assessmentPDF812 KB30.04.2021
- Document 18 – Geotechnical investigation – 18.01 Geotechnical reportPDF34 MB30.04.2021
- Document 18 – Geotechnical investigation – 18.02 Overview planPDF5 MB30.04.2021
- Document 18 – Geotechnical investigation – 18.03 Site and explanatory plansPDF17 MB30.04.2021
- Document 18 – Geotechnical investigation – 18.04 Explanatory tablePDF7 MB30.04.2021
- Document 18 – Geotechnical investigation – 18.05 Geotechnical profiles and sounding diagramsPDF36 MB30.04.2021
- Document 18 – Geotechnical investigation – 18.05 PlansPDF49 MB30.04.2021
- Document 18 – Geotechnical investigation – 18.06 Soil mechanics laboratory testsPDF26 MB30.04.2021
- Document 18 – Geotechnical investigation – 18.07 Other laboratory testsPDF13 MB30.04.2021
- Document 19 – Hydrogeological assessment – 19.00 DocumentPDF824 KB30.04.2021
- Document 19 – Hydrogeological assessment – 19.01 Explanatory reportPDF55 MB30.04.2021
- Document 19 – Hydrogeological assessment – 19.02 Hydrogeological mapsPDF43 MB30.04.2021
- Document 19 – Hydrogeological assessment – 19.03 Hydrogeological cross-sectionsPDF17 MB30.04.2021
- Document 19 – Hydrogeological assessment – 19.04 Maps of depth to water tablePDF42 MB30.04.2021
- Document 19 – Hydrogeological assessment – 19.05 Maps of groundwater protection levelsPDF39 MB30.04.2021
- Document 19 – Hydrogeological assessment – 19.06 Groundwater and surface water mapsPDF38 MB30.04.2021
- Document 19 – Hydrogeological assessment – 19.07 Maps of groundwater sensitivity areasPDF41 MB30.04.2021
- Document 20 – Track diagram sketchesPDF10 MB30.04.2021
- Document 21 – Aerodynamics safety case for crosswindsPDF3 MB30.04.2021
- Document 22 – Electromagnetic compatibility assessmentPDF17 MB30.04.2021
- Document 23 – Soil recycling and disposal concept – 23.00 DocumentPDF2 MB30.04.2021
- Document 23 – Soil recycling and disposal concept – 23.01 Explanatory reportPDF17 MB30.04.2021
- Document 23 – Soil recycling and disposal concept – 23.02 Suspected contamination sitesPDF30 MB30.04.2021
- Document 23 – Soil recycling and disposal concept – 23.03 Description of contamination sitesPDF18 MB30.04.2021
- Document 23 – Soil recycling and disposal concept – 23.04 Sampling pointsPDF77 MB30.04.2021
- Document 23 – Soil recycling and disposal concept – 23.05 Sampling pointsPDF35 MB30.04.2021
- Document 23 – Soil recycling and disposal concept – 23.06 Site plan of work preparations areaPDF4 MB30.04.2021
- Document 24 – Presence of sufficient escape options and lighting – 24.01 Presence of sufficient escape options and lighting at ClaudiusstrassePDF2 MB30.04.2021
- Document 24 – Presence of sufficient escape options and lighting – 24.02 Presence of sufficient escape options and lighting at BovestrassePDF268 KB30.04.2021
- Document 25 – Study of the impact of the planned noise barriers on light levelsPDF67 MB30.04.2021